Back
Feb 2010
Canadian contractor using an M-1000 on a remove
and replace job.



This Contractor used a Right Hand M-8100 to pour this 50" (1.27 m) wide Scab-On
Curb & Gutter in Ecuador, South America

Steep Grades with Superelevated Curves were prevalent throughout
this jobsite.

For safety, a Right Hand M-8100 was chosen to
pour with the flow of traffic on the winding limited sight road.